Setup and Installation | Dry Block Heaters
Step-by-Step Guide to Setting Up Your Product Correctly
Applicable Models:
TDB-1-4E TDB-2-4E TDB-4-4E |
📜 Quick Navigation
🔍 Need More Information?
📂 Getting Started
⚙️ Operating Procedures
🧰 Maintenance & Cleaning
🔧 Troubleshooting & Repair
📜 Warranty & Support
Location
- Ensure the dry block heater is placed in a suitable environment, away from direct sunlight and heat sources.
- Do not operate the unit in a room where the ambient temperature exceeds its maximum operating temperature.
- The dry block heater must be stored indoors at all times.
- Extreme Operating Environment:
- Temperature: +5°C to +40°C
- Humidity: Up to 80%RH
- Ensure the dry block heater is placed on a level surface and that the mains plug and the switch are easily accessible.
- The dry block heater requires 100mm on the sides and back for ventilation and also to aid with accessibility.
Aluminium Block Loading
When in use, ensure the dry block heater is fully loaded with the appropriate number of blocks (one, two, or four, depending on the model). Gently lower the aluminium blocks into the block heater in the correct orientation to ensure proper operation and avoid damage. A handy tool is included with the dry block heater, which can be screwed into the threaded hole of the block to safely remove it.
Caution: Take care when handling the blocks, as they may be hot during or after operation.