Skip to content
English
  • There are no suggestions because the search field is empty.

Operating Procedures | Laboratory Cold Plates

Comprehensive Guidelines on Using Your Product Safely, Effectively, and for Optimal Performance

Applicable Models:

TCP-3  

📜 Quick Navigation

Start Up Procedure

OMRON Controller Guide

 

 

🔍 Need More Information?

📂 Getting Started

📦 Setup & Installation

🧰 Maintenance & Cleaning

🔧 Troubleshooting & Repair

📜 Warranty & Support

 


Start Up Procedure

  • Take the supplied lead and plug it into the male IEC socket on the left side of the cold plate.
  • Next, plug into a 10A General Purpose Outlet.
    Graphic - IEC
  • Turn the main switch adjacent to the temperature control to 'ON' to start the cold plate.
  • The controller will go through a warm up period where all segments of the display will be on before indicating the set temperature (SV) on the lower display and current temperature (PV) on the top display.

Cold Plate Start Up

Controller

Cold plate uses an OMRON controller. The controller is an Omron E5CC-T microprocessor based device with digital indication of set temperature and operating temperature as well as multi step programming as standard.

To access the complete OMRON Controller, please refer to the OMRON Controller manual. The guide provides detailed instructions and support for setup and configuration.